La Collette Recycling Facility

Contract Administrator

David Mason of IPM Ltd

Value

£440K

Programme

16 weeks

AC Mauger Small Works | La Collette Recycling Facility AC Mauger Small Works | La Collette Recycling Facility AC Mauger Small Works | La Collette Recycling Facility AC Mauger Small Works | La Collette Recycling Facility
AC Mauger Projects | La Collette Recycling Facility

La Collette Recycling Facility

 

This project entailed the construction of a new plant store building and platform works within the fully operating incinerator building .

The plant store building comprised a structural steel frame with two new in-situ concrete slabs, with single layer sheeting cladding to the sides and roof of the structure. The mechanical and electrical installation comprised lighting, power and data points, electrical fans providing positive pressure internally, a full fire protection and alarm system including sprinklers and PAC access control.

The platform works comprised manufacturing and installing purpose made hot dipped galvanized platforms into position next to, between and on top of moving machinery, plant, valves and gauges. The initial surveys on this section of the project were critical in ensuring all sizes, shapes and levels were correct as no cutting or welding was permitted on site.

The combined works completed on time and within the construction budget and a high quality building was handed over to the client with platforms that have made maintenance of the plant easier and safer.